Borehole Installation and Pumping Station in Walthamstow
Enisca Browne delivered two complex infrastructure projects: the Runleywood Borehole for Affinity Water and a pumping station at Walthamstow Wetlands for Thames Water.
Water Treatment Works Upgrade at Arlington
Enisca Browne was appointed by South East Water to deliver a £8.25 million upgrade at Arlington Water Treatment Works, modernising infrastructure and improving efficiency at the 1972-built facility.
Pumping Station & Treatment Emergency Response at Butler WTW
Following an emergency loss of bulk water storage in South East Water's network, Enisca Browne was appointed to rapidly design and construct a new 24ML/D high lift pumping station.
Environmental Protection at Hazards Green WTW
Enisca Browne was appointed by South East Water to design and install specialist screening systems at Hazards Green WTW, meeting the UK’s Eel Regulations (2009) to protect the European eel population while maintaining safe operations.
Enisca Browne are
proud to work with